Commit Graph

1 Commits

Author SHA1 Message Date
cbb8ae548c docs(backlog): add WP-18..22 (productie-volwassenheid phase)
Some checks failed
CI / storybook-a11y (push) Successful in 4m12s
CI / backend (push) Successful in 1m6s
CI / api-client-drift (push) Successful in 1m37s
CI / frontend (push) Successful in 1m31s
CI / codeql (csharp) (push) Failing after 1m51s
CI / codeql (javascript-typescript) (push) Failing after 1m24s
Gap analysis found the POC's designed-but-unbuilt strategic gaps: ABAC
authorization (ADR-0002/PRD-0002 phase P1), no e2e coverage, unproven
i18n second-locale seam, thin resilience seams (correlation-id,
idempotency, retry), and in-memory-only persistence. Each WP is grounded
in the current code (file paths + line numbers), not just the analysis.

Also corrects PRD-0001's stale 'Proposed' status header — the Mijn
aanvragen vertical is fully built.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
2026-07-03 20:07:05 +02:00