Two backlog trees are complete: `docs/project/backlog/` (75 files, every WP done) and `docs/project/refactor-backlog-setup/` (the arc before it). Move both under `docs/project/archive/` with `git mv`, so history stays intact through `git log --follow`. `SHOWCASE-ROADMAP.md` moves with them, because it points at the now-archived backlog README. Add `docs/project/archive/README.md`. It states that these trees are historical and names the two directories that are still live. Repoint every inbound reference named in RD-30's Files table: CLAUDE.md, the root README, both backend READMEs, `LetterHtml.cs`, `a11y.mdx`, the `document-feature` and `new-ssp` skills, and the readable-codebase PLAN, README, and RD-19 ticket. Fix two upward-relative links inside the moved WP files (WP-68, WP-69) that gained a directory level and would otherwise break. Repoint `.prettierignore`'s two agent-prompt exclusions to their new path, so prettier keeps leaving those files' exact wording alone. Mark RD-30 done and check off its acceptance criteria; flip its README row to done. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2.7 KiB
2.7 KiB
Refactoring backlog — automated setup
What's in this package
refactor-backlog-setup/
setup.sh ← run this once, from the root of the target repo
agents/ ← source prompts (edit these if you need to tweak
scope/wording before running setup.sh)
_persistence-protocol.md
00-baseline.prompt.md
01-readability.prompt.md
02-testability.prompt.md
03-ddd-hexagonal.prompt.md
04-cqrs-light.prompt.md
05-bdd.prompt.md
06-adr-conformance.prompt.md
07-bio2-compliance.prompt.md
08-consolidation.prompt.md
09-implementation.prompt.md (template — one TICKET-ID per Phase 3 dispatch)
Usage
- Copy this
refactor-backlog-setup/folder into the root of the target repo (or reference it via a relative path). - Edit anything in
agents/if scope/exclusions need repo-specific detail (e.g. exact module paths, ADR folder location) — the prompts currently use the defaults agreed in the design conversation. - Run:
This creates
bash refactor-backlog-setup/setup.sh./refactor-backlog/with:_status.mdinitialized, all agentsnot_started00-baseline.mdthrough07-bio2-compliance.mdinitialized with headers99-backlog.mdempty, ready for Consolidationimplementation/folder for Phase 3 notesfinal-prompts/— every agent prompt with the persistence protocol already merged in. These are the exact prompts to dispatch — no manual copy-paste needed.
Dispatch order
- Dispatch
final-prompts/00-baseline.prompt.md(Opus). Wait for_status.md→ baseline: complete. - Dispatch the 7 Phase 1 prompts in parallel (Opus):
01through07. Each checks its own dependency in_status.mdbefore starting. - Once all 7 show
complete, dispatchfinal-prompts/08-consolidation.prompt.md(Opus). It writes99-backlog.mdand halts for human approval — check the file for anyADR-fixor BIO2-flagged tickets before proceeding. - For each approved ticket, copy
final-prompts/09-implementation.prompt.md, fill inTICKET-ID:, dispatch (Sonnet). Run tickets in parallel within a CD batch, sequential across batches, per theDepends oncolumn in99-backlog.md.
Re-running / resuming
Safe to re-run setup.sh only on a fresh workspace — it does not check for an
existing ./refactor-backlog/ and will overwrite _status.md and the phase
output files. If a run is already in progress, don't re-run setup.sh; just
re-dispatch the relevant final-prompts/*.prompt.md — each agent reads
_status.md and its own output file first and resumes from where it left off.