Commit Graph
2 Commits
Author SHA1 Message Date
not dc532dee00 test(domain): herregistratie inscription date + reminder-due rule (refs #18)
The Registration aggregate gains the herregistratie clock: Approve now records
the inscription moment, from which the herregistratie deadline and a
reminder-due rule are derived. Members are stubbed so the suite compiles and the
new assertions fail; the green commit implements them. Approve's signature gains
the inscription moment (callers now supply 'now' from an injected TimeProvider).

refs #18
2026-07-23 11:51:11 +02:00
not 1c185e6686 S-09b: Approval flow — temp admin endpoint + status transition to projection (#77)
CI / lint (push) Successful in 1m25s
CI / build (push) Successful in 1m13s
CI / unit (push) Successful in 1m26s
CI / mutation (push) Successful in 6m6s
CI / verify-stack (push) Successful in 7m34s
CI / frontend (push) Successful in 2m35s
## What & why

S-09b (#75, split from #10) — the **approval flow** that completes the walking skeleton. A behandelaar can now approve a submitted registration; the entry flips from `INGEDIEND` to `INGESCHREVEN` in the public register. Flow: `POST /registrations/{id}/approve` (domain) → ACL sets the zaak eindstatus (ZGW `/statussen`) → OpenZaak → NRC → event-subscriber → projection → openbaar.

## Changes (bottom-up, each red→green TDD)

- **Domain** — `RegistrationStatus.Ingeschreven` + `Registration.Approve()` (guards: opened zaak, only from INGEDIEND); `ApproveRegistration` use case (idempotent) + temp `POST /registrations/{id}/approve` endpoint; `IAclClient.ApproveZaakAsync`.
- **ACL** — resolves the zaaktype's **eindstatus** from the catalogus (`isEindstatus` / highest volgnummer) and POSTs a ZGW status; exposed as `POST /statussen`. Unit + real-OpenZaak integration test.
- **Event-subscriber** — binds NRC `hoofdObject`, projects a `status`/`create` as `INGESCHREVEN` keyed on the zaak (updates the existing row), **without reading OpenZaak** (§8.1). Retains the ZGW `resource` in the log (new column + EF migration) so a rebuild reproduces the status.
- **e2e** — extended: submit → public INGEDIEND → approve → public INGESCHREVEN.
- **Docs** — ADR-0011 (the two non-obvious decisions + the walking-skeleton assumption) + demo note.

## Key decisions (see ADR-0011)

- **ACL discovers the eindstatus** (chosen over injecting a statustype URL): no new config/seed plumbing, domain stays ZGW-ignorant.
- **Any post-creation status-set ⇒ INGESCHREVEN**: in the walking skeleton the only status ever set after creation is the approval, and the subscriber may not read ZGW — documented to tighten when more transitions arrive (S-12+).

## Verification

- All .NET unit suites green locally (domain 47, acl 11, event-subscriber 14, bff 16, acceptance 7); Release build + `dotnet format` clean.
- No new compose config (the eindstatus-discovery approach avoided it).
- The real-OpenZaak integration test (ACL status-set) and the full submit→approve→visible e2e run in CI `verify-stack` (live NRC→projection + selectielijst egress, not reproducible locally).

closes #75

Reviewed-on: #77
2026-07-14 09:04:57 +00:00