Files
ehoandClaude Opus 5 12f17d9d73 docs: archive the finished backlogs (RD-30)
Two backlog trees are complete: `docs/project/backlog/` (75 files, every
WP done) and `docs/project/refactor-backlog-setup/` (the arc before it).
Move both under `docs/project/archive/` with `git mv`, so history stays
intact through `git log --follow`. `SHOWCASE-ROADMAP.md` moves with them,
because it points at the now-archived backlog README.

Add `docs/project/archive/README.md`. It states that these trees are
historical and names the two directories that are still live.

Repoint every inbound reference named in RD-30's Files table: CLAUDE.md,
the root README, both backend READMEs, `LetterHtml.cs`, `a11y.mdx`, the
`document-feature` and `new-ssp` skills, and the readable-codebase PLAN,
README, and RD-19 ticket. Fix two upward-relative links inside the moved
WP files (WP-68, WP-69) that gained a directory level and would otherwise
break. Repoint `.prettierignore`'s two agent-prompt exclusions to their
new path, so prettier keeps leaving those files' exact wording alone.

Mark RD-30 done and check off its acceptance criteria; flip its README
row to done.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-09-08 23:00:38 +02:00

64 lines
2.7 KiB
Markdown

# Refactoring backlog — automated setup
## What's in this package
```
refactor-backlog-setup/
setup.sh ← run this once, from the root of the target repo
agents/ ← source prompts (edit these if you need to tweak
scope/wording before running setup.sh)
_persistence-protocol.md
00-baseline.prompt.md
01-readability.prompt.md
02-testability.prompt.md
03-ddd-hexagonal.prompt.md
04-cqrs-light.prompt.md
05-bdd.prompt.md
06-adr-conformance.prompt.md
07-bio2-compliance.prompt.md
08-consolidation.prompt.md
09-implementation.prompt.md (template — one TICKET-ID per Phase 3 dispatch)
```
## Usage
1. Copy this `refactor-backlog-setup/` folder into the root of the target repo
(or reference it via a relative path).
2. Edit anything in `agents/` if scope/exclusions need repo-specific detail
(e.g. exact module paths, ADR folder location) — the prompts currently use
the defaults agreed in the design conversation.
3. Run:
```
bash refactor-backlog-setup/setup.sh
```
This creates `./refactor-backlog/` with:
- `_status.md` initialized, all agents `not_started`
- `00-baseline.md` through `07-bio2-compliance.md` initialized with headers
- `99-backlog.md` empty, ready for Consolidation
- `implementation/` folder for Phase 3 notes
- `final-prompts/` — every agent prompt with the persistence protocol
already merged in. **These are the exact prompts to dispatch — no manual
copy-paste needed.**
## Dispatch order
1. Dispatch `final-prompts/00-baseline.prompt.md` (Opus). Wait for
`_status.md` → baseline: complete.
2. Dispatch the 7 Phase 1 prompts in parallel (Opus): `01` through `07`.
Each checks its own dependency in `_status.md` before starting.
3. Once all 7 show `complete`, dispatch `final-prompts/08-consolidation.prompt.md`
(Opus). It writes `99-backlog.md` and halts for human approval — check the
file for any `ADR-fix` or BIO2-flagged tickets before proceeding.
4. For each approved ticket, copy `final-prompts/09-implementation.prompt.md`,
fill in `TICKET-ID:`, dispatch (Sonnet). Run tickets in parallel within a CD
batch, sequential across batches, per the `Depends on` column in
`99-backlog.md`.
## Re-running / resuming
Safe to re-run `setup.sh` only on a fresh workspace — it does not check for an
existing `./refactor-backlog/` and will overwrite `_status.md` and the phase
output files. If a run is already in progress, don't re-run `setup.sh`; just
re-dispatch the relevant `final-prompts/*.prompt.md` — each agent reads
`_status.md` and its own output file first and resumes from where it left off.